Dock Bumper Installation | D fender Installation Methods | Step of Installation D rubber Fender | Cara Pasang Getah D Fender | How to Install Rubber D-Fender
Specifications
Details
Step-by-Step Installation Guide for DD Hollow Rubber Fender | D Shaped Dock Bumper
Installing a DD Hollow Rubber Fender correctly ensures maximum impact absorption, long service life, and reliable protection for ports, jetties, boats, trucks, and warehouses across Sabah, Sarawak, and Brunei. Below is a comprehensive step-by-step guide:
🔹 Step 1: Site Preparation
- Inspect the Installation Surface
- Ensure the dock wall, jetty, or vessel surface is clean, flat, and free of rust, debris, oil, or marine growth.
- For concrete structures (e.g., Kota Kinabalu Port, Kuching Wharf, Muara Jetty), check for cracks and repair before installation.
- For steel structures (e.g., tugboats, workboats, pontoons), remove rust and apply anti-corrosion coating.
- Mark the Fender Position
- Using chalk or markers, outline the exact alignment where the fender will be bolted.
- Ensure correct spacing and alignment so the fender covers the main impact zones.
🔹 Step 2: Drill Mounting Holes
- Positioning Holes
- The DD Hollow Fender has a D-shaped hollow core, allowing bolts to pass through its internal cavity.
- Mark drill points along the fender length, typically 500mm – 1,000mm intervals depending on size.
- Drill Anchors
- Use a hammer drill for concrete or a magnetic drill for steel surfaces.
- Drill holes that match the bolt diameter (e.g., M16, M20, M24 depending on fender size).
🔹 Step 3: Insert Bolts & Anchors
- Anchor Installation
- For concrete docks (e.g., Sandakan Port, Sibu Jetty, Kuala Belait Wharf), use expansion anchors or chemical anchors.
- For steel vessels (e.g., tugboats in Miri, ferries in Tawau, offshore supply boats in Brunei), weld steel backing plates and align bolt holes.
- Corrosion Protection
- Use galvanized steel bolts or stainless steel bolts (AISI 316) for marine applications.
- Apply marine-grade grease or anti-seize coating to extend bolt life.
🔹 Step 4: Fender Positioning
- Align the Fender
- Place the DD Hollow Fender against the marked surface.
- Ensure the outer D-shape faces outward to absorb vessel or vehicle impact.
- Adjust position to maintain straight alignment.
- Insert Bolts Through the Hollow Core
- Pass bolts through the internal D-shaped cavity and tighten gradually.
- Use washers and backing plates for even load distribution.
🔹 Step 5: Tightening & Securing
- Tighten Bolts Evenly
- Use a torque wrench to tighten bolts gradually, avoiding overtightening.
- Start from the center bolts and move outward for uniform clamping.
- Check Alignment
- Ensure the fender is firmly pressed against the wall/vessel surface with no gaps.
- The hollow core should remain free of deformation for proper compression.
🔹 Step 6: Final Inspection
- Visual Check
- Inspect bolts, anchors, and fender alignment.
- Verify that all bolts are secured and no part of the fender is loose.
- Impact Test
- For marine installations, perform a low-speed vessel contact test (if possible).
- For loading bays, test with a truck reversing into the dock.
🔹 Step 7: Maintenance After Installation
- Routine Checks
- Inspect fenders every 3–6 months in heavy-use ports like Sepanggar, Bintulu, Muara.
- Check for wear, cracks, or loose bolts.
- Cleaning
- Remove barnacles, algae, and dirt buildup in marine areas (e.g., Tawau, Semporna, Limbang).
- Bolt Re-Tightening
- Re-check torque levels periodically, especially after high-impact events.
✅ Summary
The DD Hollow Rubber Fender is easy to install using bolt-through mounting and requires minimal maintenanceonce secured. With correct installation, it provides long-lasting protection for ports, boats, warehouses, bridges, and terminals across Sabah, Sarawak, and Brunei.
View more about Dock Bumper Installation | D fender Installation Methods | Step of Installation D rubber Fender | Cara Pasang Getah D Fender | How to Install Rubber D-Fender on main site